Skip to main content

What our clients say

“Working with accelopment for the proposal and management of our EU project made THE difference. I really appreciate and enjoy the professional and smooth way of cooperation.“

Prof. Bernd Stannowski

PEPPERONI Project Coordinator
Helmholtz-Centrum Berlin (HZB), Germany

Joint Action for Long-lasting Industrial Perovskite/Silicon Tandem Solar Cells for Next-Generation European PV Manufacturing

Perovskite/silicon tandems could become the next terawatt-scale photovoltaics technology and contribute to the energy transition, provided they reach service lifetimes of 30 years, which is not attained yet. Commercialisation is further limited by the absence of perovskite-specific reliability standards, unclear energy yield and non-mature mass-manufacturing equipment and materials for key processes.

JALAPENO will address these challenges and demonstrate industrial tandem cells with median total-area efficiencies above 31% in pilot-line production. These will be integrated in commercial-size modules with aperture-area efficiencies above 29%. Through innovations in processes and materials, tandems will be engineered to remain stable under the most demanding reliability tests, surpassing current standards. New test protocols tailored to perovskite/Si tandems will be developed within the project and proposed as the foundation for future standards. In addition, stable outdoor operation will be validated, advancing the technology’s readiness toward market entry.

Equipment and processes for scalable perovskite deposition, including thermal evaporation, low-damage sputtering, and silver free interconnection, will be developed and integrated at a fully operational megawatt-scale pilot line. Lead-scavenging strategies and hydrometallurgical metal recovery processes will further ensure safe and sustainable end-of-life management of tandem modules. JALAPENO builds on Qcells’ EU co-funded megawatt-scale pilot line, which has already demonstrated industrial production of tandem cells with record efficiencies and tandem modules showing promising, though not yet sufficient, reliability. Leading research institutes, specialised material suppliers, equipment manufacturers, and accredited testing bodies will work together to overcome the remaining challenges to deliver bankable high-efficiency tandem modules that meet the reliability requirements for industrial deployment.

This project contributes to the UN Sustainable Development Goal (SDG) 7 Affordable And Clean Energy, 9 Industry, Innovation and Infrastructure, and 13 Climate Action.

Facts

Programme:

HORIZON-CL5-2026-02-D3-10

Duration:

01.01.2027 - 31.12.2029

Budget:

10.25 million euro

Area:

Energy, Engineering, Environment, Manufacturing, Materials

Our Services:

Proposal Writing
Grant Preparation
Management
Dissemination

Coordinator

Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, DE

Partners

HANWHA Q CELLS GMBH, DE
Mondragon Assembly S. Coop., ES
VON ARDENNE GmbH, DE
Eternal Sun BV, NL
WAVELABS Eternal Sun GmbH, DE
Dyenamo AB, SE
IP FAB BV, BE
accelopment Schweiz AG, CH
Centre Technologique international de la Terre et Pierre, BE
Institut National de l’Environnement et des Risques, FR
Polymer Competence Center Leoben GmbH, AT
Centre Suisse d'Electronique et de Microtechnique – Recherche et Developpement, CH
Fraunhofer Institute for Solar Energy Systems ISE, DE
University of Ljubljana, SI
Kauno Technologijos Universitetas, LT

Our team

I am passionate about collaborating with researchers and transforming their ideas into tangible solutions. Their gratefulness is what drives me to do an outstanding job.

Dr. Johannes Ripperger

Research & Innovation Manager
Green DealEnergyEUREKA Eurostars
©accelopment Schweiz AG
+41 44 455 66 00 
info@accelopment.com  
ISO 9001 certified
© 2026 accelopment. All rights reserved.